The Future Corridor Conditions Final Report is the detailed technical report completed at the conclusion of Phase 1, Part 2 of the Central Okanagan Planning Study. It forecasts the performance of the Highway 97 Corridor in 2040.

Future Corridor Conditions – Detailed Technical Report – December 2016