{"id":1062,"date":"2022-03-11T09:39:29","date_gmt":"2022-03-11T17:39:29","guid":{"rendered":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/?page_id=1062"},"modified":"2025-05-22T09:29:39","modified_gmt":"2025-05-22T16:29:39","slug":"highway-99-tunnel-program","status":"publish","type":"page","link":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/highway-99-tunnel-program\/","title":{"rendered":"Highway 99 Tunnel Program"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-engagement-container\"><div class=\"engagement-page\">\n<div class=\"wp-block-engagement-content\"><bcgov-breadcrumb>\n        <a href=\"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\">Home<\/a>\n                          <span>\n        Highway 99 Tunnel Program\n  <\/span>\n  <div style=\"display: flex\" slot=\"breadcrumb-extra\">\n      <\/div>\n  <\/bcgov-breadcrumb>\n\n\n<h1 class=\"bcgov-engagement-header \">Highway 99 Tunnel Program<\/h1><div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"778\" height=\"1024\" src=\"https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-778x1024.jpg\" alt=\"\" class=\"wp-image-3717\" style=\"width:468px\" srcset=\"https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-778x1024.jpg 778w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-228x300.jpg 228w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-768x1011.jpg 768w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-1166x1536.jpg 1166w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-1555x2048.jpg 1555w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245-1200x1580.jpg 1200w, https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/756\/2023\/11\/H99TP-map-1-scaled-e1700009495245.jpg 1736w\" sizes=\"auto, (max-width: 778px) 100vw, 778px\" \/><\/figure><\/div>\n\n\n<p>The <a href=\"http:\/\/highway99tunnel.ca\">Highway 99 Tunnel Program<\/a> includes the Fraser River Tunnel project which is the new immersed tube tunnel to replace the existing George Massey Tunnel, as well as four key corridor improvement projects along Highway 99 that will improve traffic, transit and active transportation between Bridgeport Road and Highway 17.<\/p>\n\n\n\n<p>Corridor improvements include the Steveston Interchange project and transit and cycling improvements (Bridgeport bus connection, Highway 99\/17A off-ramp widening and bus-on-shoulder lanes).<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>The Province, after collaboration with key municipal, regional and participating Indigenous groups, began work in January 2022 on corridor improvements as a preliminary solution to help alleviate traffic congestion and improve transit and cycling infrastructure along Highway 99 while planning, procurement and permitting for the new immersed tube tunnel continues.<\/p>\n\n\n\n<p>The three transit and cycling improvements are completed, and the Steveston Interchange project is scheduled to complete in 2025.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Highway 99 Tunnel Program Animation\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/R8NGfbAjHec?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n<\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Highway 99 Tunnel Program includes the Fraser River Tunnel project which is the new immersed tube tunnel to replace the existing George Massey Tunnel, as well as four key corridor improvement projects along Highway 99 that will improve traffic, transit and active transportation between Bridgeport Road and Highway 17. Corridor improvements include the Steveston &hellip; <a href=\"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/highway-99-tunnel-program\/\" role=\"presentation\" aria-hidden=\"true\" tabindex=\"-1\" >Read More<\/a><\/p>\n","protected":false},"author":5332,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1062","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/pages\/1062","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/users\/5332"}],"replies":[{"embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/comments?post=1062"}],"version-history":[{"count":5,"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/pages\/1062\/revisions"}],"predecessor-version":[{"id":5482,"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/pages\/1062\/revisions\/5482"}],"wp:attachment":[{"href":"https:\/\/engage.gov.bc.ca\/fraserrivertunnel\/wp-json\/wp\/v2\/media?parent=1062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}