{"id":33077,"date":"2011-01-06T15:55:49","date_gmt":"2011-01-06T23:55:49","guid":{"rendered":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/?post_type=impact&#038;p=33077"},"modified":"2023-03-09T10:34:16","modified_gmt":"2023-03-09T18:34:16","slug":"evergreen-rapid-transit-line-project-results","status":"publish","type":"engagement","link":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/engagement\/evergreen-rapid-transit-line-project-results\/","title":{"rendered":"Evergreen Rapid Transit Line Project"},"content":{"rendered":"<h1 class=\"wp-block-post-title\">Evergreen Rapid Transit Line Project<\/h1>\n\n<h2><strong>What was this engagement about?<\/strong><\/h2>\n<p>The Evergreen Line is a new rapid transit line that connects Coquitlam to Vancouver via Port Moody and Burnaby.\u00a0 The Ministry of Transportation and Infrastructure completed a comprehensive multi-round engagement process with communities along the route alignment as well as with other key regional and provincial stakeholders and the public as the Evergreen Line Project.<br \/>\u00a0<br \/>All five rounds of public engagement planned for the Evergreen Line Project have been completed.<br \/>\u00a0<\/p>\n<h2><strong>Engagement Timeframe<\/strong><\/h2>\n<p>September 2009 &#8211; December 2010<br \/>\u00a0<\/p>\n<h2><strong>How did my contribution make a difference?<\/strong><\/h2>\n<p>All comments were considered as part of transportation planning.<br \/>\u00a0<br \/><strong>The Millennium Line Evergreen Extension is now <a href=\"https:\/\/www.translink.ca\/evergreen\">open<\/a>! <\/strong><\/p>\n<p>The Evergreen Extension is a significant expansion of our integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network, and West Coast Express.<\/p>\n<p>With the opening of the Evergreen Extension on Dec. 2, 2016 Metro Vancouver now has the longest, fully-automated, driverless, rapid-transit system in the world.<\/p>\n<p>The six new Millennium Line stations include Lafarge Lake\u2013Douglas, Lincoln, Coquitlam Central, Inlet Centre, Moody Centre, and Burquitlam.<\/p>\n<p>\u00a0<\/p>","protected":false},"featured_media":0,"parent":0,"menu_order":0,"template":"","engagement_category":[307],"engagement_region":[297],"engagement_status":[52],"engagement_pin_group":[],"class_list":["post-33077","engagement","type-engagement","status-publish","hentry","engagement_category-transportation","engagement_region-lower-mainland-southwest","engagement_status-closed"],"acf":[],"aioseo_notices":[],"pinned_engagement_toggle":false,"_links":{"self":[{"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement\/33077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement"}],"about":[{"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/types\/engagement"}],"version-history":[{"count":1,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement\/33077\/revisions"}],"predecessor-version":[{"id":60532,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement\/33077\/revisions\/60532"}],"wp:attachment":[{"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/media?parent=33077"}],"wp:term":[{"taxonomy":"engagement_category","embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement_category?post=33077"},{"taxonomy":"engagement_region","embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement_region?post=33077"},{"taxonomy":"engagement_status","embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement_status?post=33077"},{"taxonomy":"engagement_pin_group","embeddable":true,"href":"https:\/\/engage.gov.bc.ca\/govtogetherbc\/wp-json\/wp\/v2\/engagement_pin_group?post=33077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}