Proposed Corridor Improvements (February 2021)

Public Information Materials (February 2020)

Display Boards

Handout

Fly-through animation – Bridge (Artistic rendering and subject to change)

Fly-through animation – Tunnel (Artistic rendering and subject to change)

2019 Engagement Summary Report

Technical Services Report (December 2019)

Executive Summary

Main Report

Appendix A: Feasibility of Continued Use of Existing Tunnel

Appendix B: Bored Tunnel Technical Summary

Appendix C: Immersed Tube Tunnel Technical Summary

Appendix D: Long Span Bridge Technical Summary

Appendix E: Geotechnical Summary

Appendix F: Environmental Technical Summary

Appendix G: Preliminary Hydrotechnical Summary

Appendix H: Traffic and Geometrics Technical Report Part 1

Appendix H: Traffic and Geometrics Technical Report Part 2

Appendix H: Traffic and Geometrics Technical Report Part 3

Appendix H: Traffic and Geometrics Technical Report Part 4

Appendix I: Examples of MUPs in Tunnels

Appendix J: Estimated Range of Project Costs

Appendix K: Renderings

Environmental Input to GMC Multiple Accounts Evaluation (December 2019)

Task Force Meeting Presentation – Highres Part1 (October 2019)

Task Force Meeting Presentation- Highred Part2 (October 2019)

Task Force Meeting Presentation (October 2019)

Principles, Goals and Objectives (June 2019)

Preliminary Long-list of Options (June 2019)

Evaluation Framework (MAE) (June 2019)

Technical Briefing December 2018

Independent Technical Review September 2018

Independent Technical Review Terms of Reference